• Tungsten Scrap CNC Cutting Blades 70%min Ex-VAT Delivered Chinadown(-15)  09-18|Tungsten Scrap Drills 88%min Ex-VAT Delivered Chinadown(-15)  09-18|Tungsten Scrap Anvil 90%min Ex-VAT Delivered Chinadown(-15)  09-18|Calcined Pet Coke S 3%max EXW Chinaup(100)  09-18|Antimony Trioxide 99.5%min In warehouse Rotterdamdown(-1.4)  09-18|Tungsten APT 88.5%min In warehouse Rotterdamup(15)  09-18|Tungsten APT 88.5%min FOB Chinaup(15)  09-18|Bismuth Ingot 99.99%min EXW Chinaup(3000)  09-18|Ferro-tungsten 75%min In warehouse Rotterdamup(2)  09-18|Bismuth Oxide 99.9%min EXW Chinaup(3000)  09-18|Germanium Metal 99.99%min Delivered Europeup(100)  09-18|Germanium Metal 99.99%min Delivered USup(100)  09-18|Rebar BS4449 GR500 16mm In warehouse Kuala Lumpurdown(-50)  09-18|Wire Rod SAE1008 5.5mm In warehouse Kuala Lumpurdown(-50)  09-18
  • Shandong to reduce steel production capacity by 18.86 million tons before the end of 2022

    2022-04-21 18:28:33   [Print]
    Recently, Shandong Government published an action proposal about Carbon Peak and Carbon Neutrality in 2022, proposing to promote the reduction of low-efficiency and backward production capacity this year.Asian Metal CopyrightRecently, Shandong Government published an action proposal about Carbon Peak and Carbon Neutrality in 2022, proposing to promote the reduction of low-efficiency and backward production capacity this year.Asian Metal Copyright By the end of 2022, the steel and iron production capacity in BTH "2+26" cities (excluding Laiwu District and Gangcheng District in Jinan) shall be moved out totally in principle, including 18.Asian Metal Copyright By the end of 2022, the steel and iron production capacity in BTH "2+26" cities excluding Laiwu District and Gangcheng District in Jinan shall be moved out totally in principle, including 18.Asian Metal Copyright86 million tons of steel production capacity and 19.Asian Metal Copyright75 million tons of iron production capacity.Asian Metal Copyright75 million tons of iron production capacity.
    .Asian Metal Copyright By the end of 2022, the steel and iron production capacity in BTH "2+26" cities excluding Laiwu District and Gangcheng District in Jinan shall be moved out totally in principle, including 18Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.