• Copper Conc. TC 25%min CIF China(-1)  05-31|Manganese Ore Australian 45%min In Tianjin Port(4)  05-31|Manganese Ore Gabonese 44%min In Tianjin Port(3.7)  05-31|Manganese Ore Brazilian 44%min In Tianjin Port(3.5)  05-31|Manganese Ore Australian 45%min In Qinzhou Port(2)  05-31|Antimony Ingot 99.65%min In warehouse Baltimore(0.24)  05-31|Indium Ingot 99.995%min Delivered US(9)  05-31|Silicon Metal 5-5-3 In port India(5)  05-31|Cobalt Metal 99.8%min Delivered China(-6)  05-31|Silicon Metal 98.5%min Delivered US(0.05)  05-31|Ferro-silicon 72%min EXW China(200)  05-31|Indium Ingot 99.995%min Delivered Europe(9)  05-31|Indium Ingot 99.995%min FOB China(10)  05-31|Bismuth Ingot 99.99%min EXW China(2000)  05-31
  • Kaijin New Energy commences construction of Li-battery anode material project in Yancheng

    2022-03-04 16:53:41   [Print]
    On February 28, Guangdong Kaijin New Energy Technology Co.Asian Metal Copyright Stage two with an investment of RMB3 billion USD0.Asian Metal Copyright, Ltd.Asian Metal Copyright Stage two with an investment of RMB3 billion USD0.Asian Metal Copyright staged a groundbreaking ceremony for its Li-battery anode material project in Yancheng, Jiangsu.

    With a total estimated investment of RMB6 billion (USD0.95 billion) to construct a 200,000tpy Li-battery anode material production base and research and test centers, the project will be built at two stages.Asian Metal CopyrightOn February 28, Guangdong Kaijin New Energy Technology Co.Asian Metal Copyright Stage one with an investment of RMB3 billion (USD0.Asian Metal Copyright47 billion will focus on grinding, surface engineering, low-temperature carbonization and storage facilities, and is expected to go into operation in June 2022.Asian Metal Copyright47 billion) will focus on grinding, surface engineering, low-temperature carbonization and storage facilities, and is expected to go into operation in June 2022.Asian Metal Copyright Stage one with an investment of RMB3 billion USD0.Asian Metal Copyright Stage two with an investment of RMB3 billion (USD0.Asian Metal Copyright staged a groundbreaking ceremony for its Li-battery anode material project in Yancheng, Jiangsu.Asian Metal Copyright47 billion) will focus on high-temperature carbonization and super-high-temperature graphitization processing, expected to start construction in June 2022 and go into operation in June 2023.

    .Asian Metal Copyright47 billion will focus on grinding, surface engineering, low-temperature carbonization and storage facilities, and is expected to go into operation in June 2022Asian Metal Copyright
    Spodumene Li2O 6%min CIF China
    Unit:USD/mt
    China lithium carbonate 99.5%mi producers' suspension number statistics by province by month
    Unit: pcs
      Copyright © Asian Metal Ltd All rights reserved.