• Silico-manganese 65/17 EXW China(300)  04-25|Silico-manganese 60/14 EXW China(200)  04-25|Indium Ingot 99.995%min FOB China(9)  04-25|Molybdenum Conc. 45%min EXW China(100)  04-25|Steel Scrap MMS 4-6mm EXW Guangzhou(80)  04-25|Molybdenum Oxide 50%min EXW China(100)  04-25|Zirconium Sponge Zr+Hf 99.4%min EXW China(-5)  04-25|Ferro-silicon 75%min In warehouse Pittsburgh(0.03)  04-25|Iron Ore Fine Australian 62%min CNF China(3)  04-25|Ferro-molybdenum 60%min EXW China(6000)  04-25|Indium Ingot 99.995%min EXW China(60)  04-25|Copper Conc. TC 25%min CIF China(-1)  04-25|Calcium-silicon 30-60 FOB China(40)  04-25|Molybdenum Oxide 57%min In port South Korea(0.5)  04-25
  • Transasia Minerals plans to develop nickel processing facility in Indonesia by 2024

    2022-01-21 13:44:54   [Print]
    On January 9, Indonesia-based Transasia Minerals Ltd announced its plans to proceed with developing a nickel processing facility in Morowali, Central Sulawesi, Indonesia.

    The nickel processing facility in Morowali is slated to complete construction by 2024. The project investment is estimated at USD 2 billion, and the facility will focus on the production of ferronickel and EV battery grade nickel sulphate, a raw material used to produce EV batteries.

    With Indonesia moving towards boosting economic growth and looking to attract foreign direct investment, the nation's abundant nickel reserves provide a platform to scale up the value-chain and become a hub for end-to-end battery making.
    .Asian Metal Copyright The project investment is estimated at USD 2 billion, and the facility will focus on the production of ferronickel and EV battery grade nickel sulphate, a raw material used to produce EV batteriesAsian Metal Copyright
    Ferro-nickel 1.5%min EXW China
    Unit:RMB/mt
    China ferronickel producers' suspension number statistics by province by month
    Unit: pcs
      Copyright © Asian Metal Ltd All rights reserved.