• Copper Conc. TC 25%min CIF Chinadown(-3)  07-04|Chrome Lump S.A. 38%min CIF Chinadown(-7)  07-04|Zircon Sand S.A. Zr(Hf)O2 66%min CIF Chinadown(-50)  07-04|Zircon Sand Australian Zr(Hf)O2 66%min In port Chinadown(-50)  07-04|Coal Tar Pitch Coking Value 53%min EXW Chinadown(-100)  07-04|Molybdenum Scrap Cutting 99.95%min Ex-VAT EXW Chinaup(8)  07-04|Yttrium Oxide 99.999%min In warehouse Rotterdamup(0.3)  07-04|Selenium Powder 99.9%min Delivered Indiaup(50)  07-04|Chrome Lump S.A. 38%min In port Chinadown(-1)  07-04|Silico-manganese 60/14 EXW Chinaup(100)  07-04|Silico-manganese 65/17 EXW Chinaup(100)  07-04|Rebar HRB400 20mm In warehouse Guangzhouup(50)  07-04|Flake Graphite +195 EXW Chinadown(-100)  07-04|Ferro-silicon 75%min In warehouse Rotterdamdown(-20)  07-04
  • US Steel to build $3 billon mill in Arkansas

    2022-01-13 13:36:14   [Print]
    United States Steel Corp.Asian Metal Copyright According to US Steel, the new facility will have two electric arc furnaces with 3 million tons per year of advanced steelmaking capability, a "state of the art" endless casting and rolling line and advanced finishing capabilities.Asian Metal Copyright on Tuesday announced it is building a $3 billion mill in northeast Arkansas that's expected to employ at least 900 people.

    The company said it has chosen Osceola for the site of its new mill, with construction expected to begin early this year and to be completed 2024.

    According to US Steel, the new facility will have two electric arc furnaces with 3 million tons per year of advanced steelmaking capability, a "state of the art" endless casting and rolling line and advanced finishing capabilities.

    .Asian Metal Copyright The company said it has chosen Osceola for the site of its new mill, with construction expected to begin early this year and to be completed 2024Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.