• Spodumene Li2O 5%min In port Chinadown(-30)  09-12|Tungsten Carbide 99.8%min 2.5-7.0μm FOB Chinaup(2.5)  09-12|Tungsten Bar W-4 99.9%min FOB Chinaup(2.5)  09-12|Cobalt Oxide 72%min In warehouse Rotterdamup(0.6)  09-12|PrNd Oxide Pr6O11 25%, Nd2O3 75% EXW Chinaup(15000)  09-12|Antimony Trioxide 99.5%min In warehouse Rotterdamdown(-1.3)  09-12|Spodumene Li2O 3%min In port Chinadown(-20)  09-12|Yttrium Oxide 99.999%min In warehouse Rotterdamup(2)  09-12|Spodumene Li2O 6%min CIF Chinadown(-20)  09-12|Cobalt Intermediate 30-40% CIF Chinaup(0.3)  09-12|Monazite TREO 54%min In port Chinaup(1000)  09-12|PrNd Mischmetal Pr 25%, Nd 75% EXW Chinaup(13000)  09-12|Cerium Oxide 99.9%min EXW Chinaup(200)  09-12|Arsenic Metal 99.9999%min Delivered Chinaup(5)  09-12
  • Liuzhou Steel converter plant's third dust removal renovation project completed

    2021-12-01 17:14:32   [Print]
    On November 30, the completion ceremony of the third dust removal renovation project of Liuzhou Steel converter plant was held.Asian Metal CopyrightOn November 30, the completion ceremony of the third dust removal renovation project of Liuzhou Steel converter plant was held.Asian Metal Copyright This project is an important measure for Liuzhou Steel to promote the implementation of ultra-low emissions in the metallurgical industry, push forward enterprise transformation and upgrade, high-quality development, and help win the battle against the haze day.
    .Asian Metal Copyright Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.