• HR Coil S275 JR 3.0mm In warehouse Istanbul(-30)  05-19|Dysprosium Metal 99.5%min FOB China(-17)  05-19|Met. Coke A 12.5%max; S 0.65%max EXW Hebei(-100)  05-19|Met. Coke A 13.5%max, S 0.7%max EXW Shanxi(-100)  05-19|Manganese Sulfate Mn 32%min EXW China(-250)  05-19|Ferro-silicon 75%min In warehouse Pittsburgh(-0.08)  05-19|Graphite Electrode R.P. D400mm EXW China(600)  05-19|Met. Coke A 13.5%max, S 0.7%max EXW Shandong(-100)  05-19|Ferro-silicon 75%min In warehouse Rotterdam(-80)  05-19|Cobalt Oxide 72%min Delivered China(-10)  05-19|Dysprosium Metal 99.5%min EXW China(-100)  05-19|Iron Ore Fine Australian 62%min In port China(-25)  05-19|Cobalt Sulfate 20.5%min Delivered China(-2500)  05-19|CR Coil DC01 1.0mm In warehouse Istanbul(-30)  05-19
  • Liuzhou Steel converter plant's third dust removal renovation project completed

    2021-12-01 17:14:32   【Print】
    On November 30, the completion ceremony of the third dust removal renovation project of Liuzhou Steel converter plant was held.Asian Metal Copyright .Asian Metal Copyright This project is an important measure for Liuzhou Steel to promote the implementation of ultra-low emissions in the metallurgical industry, push forward enterprise transformation and upgrade, high-quality development, and help win the battle against the haze day.
    .Asian Metal Copyright Asian Metal Copyright
      Copyright © Asian Metal Corp. All rights reserved.