• Polysilicon 9N Delivered Chinaup(1)  07-03|Chrome Lump S.A. 38%min CIF Chinadown(-6)  07-03|Zircon Sand S.A. Zr(Hf)O2 65%min CIF Chinadown(-30)  07-03|Yttrium Oxide 99.999%min In warehouse Rotterdamup(0.3)  07-03|Calcium Ingot Reductive 98%min EXW Chinaup(350)  07-03|Iron Ore Fine Australian 62%min CNF Chinaup(2)  07-03|Thorium Tungsten Electrode ThO2 1.7-2.2% EXW Chinaup(10)  07-03|HR Coil SS400 3.0mm In warehouse Kuala Lumpurdown(-50)  07-03|Ferro-vanadium 80%min In warehouse Rotterdamdown(-0.5)  07-03|Medium Plate SS400 16mm In warehouse Kuala Lumpurdown(-50)  07-03|Spodumene Li2O 5%min In port Chinaup(15)  07-03|Zircon Sand S.A. Zr(Hf)O2 66%min CIF Chinadown(-30)  07-03|Zircon Sand Australian Zr(Hf)O2 66%min In port Chinadown(-30)  07-03|Fused Zirconia Zr(Hf)O2 98.5%min EXW Chinaup(500)  07-03
  • Liuzhou Steel converter plant's third dust removal renovation project completed

    2021-12-01 17:14:32   [Print]
    On November 30, the completion ceremony of the third dust removal renovation project of Liuzhou Steel converter plant was held.Asian Metal CopyrightOn November 30, the completion ceremony of the third dust removal renovation project of Liuzhou Steel converter plant was held.Asian Metal Copyright This project is an important measure for Liuzhou Steel to promote the implementation of ultra-low emissions in the metallurgical industry, push forward enterprise transformation and upgrade, high-quality development, and help win the battle against the haze day.
    .Asian Metal CopyrightOn November 30, the completion ceremony of the third dust removal renovation project of Liuzhou Steel converter plant was heldAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.