• Yttrium Oxide 99.999%min In warehouse Rotterdamup(1)  07-18|Lanthanum Oxide 99.999%min FOB Chinaup(0.08)  07-18|Lithium Carbonate 99.2%min Delivered Chinaup(1900)  07-18|Lithium Carbonate 99.5%min Delivered Chinaup(1900)  07-18|Spodumene Li2O 6%min CIF Chinaup(20)  07-18|Spodumene Li2O 3%min In port Chinaup(20)  07-18|Silicon Metal 5-5-3 In port Indiaup(3)  07-18|Spodumene Li2O 5%min In port Chinaup(25)  07-18|Cobalt Metal 99.8%min In warehouse Baltimoredown(-0.5)  07-18|Coking Coal A 10%max, S 0.8%max EXW Henanup(30)  07-18|Zircon Sand Zr(Hf)O2 65%min, Fe2O3 0.10%max EXW Chinadown(-300)  07-18|Monazite TREO 54%min In port Chinaup(1000)  07-18|Cadmium Ingot 99.99%min In warehouse Rotterdamdown(-0.05)  07-18|Coking Coal A 10%max, S 0.8%max EXW Hebeiup(30)  07-18
  • Ezhou Hongtai Steel's 750,000tpy capacity replacement plan publicized

    2021-12-01 16:10:24   [Print]
    According to the requirements of guiding opinions and measures issued by the State Council regarding overcapacity and capacity replacement, the capacity replacement plan for the 750,000tpy electric furnace construction project of Ezhou Hongtai Steel Co.Asian Metal Copyright is hereby publicized after the application of the company and the review of the local industry and information technology department.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright is hereby publicized after the application of the company and the review of the local industry and information technology department.Asian Metal Copyright The publicity date is from November 29 to December 24, 2021.Asian Metal Copyright The publicity date is from November 29 to December 24, 2021.
    .Asian Metal Copyright, LtdAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.