• Silico-manganese 65/17 EXW China(300)  04-25|Silico-manganese 60/14 EXW China(200)  04-25|Indium Ingot 99.995%min FOB China(9)  04-25|Molybdenum Conc. 45%min EXW China(100)  04-25|Steel Scrap MMS 4-6mm EXW Guangzhou(80)  04-25|Molybdenum Oxide 50%min EXW China(100)  04-25|Zirconium Sponge Zr+Hf 99.4%min EXW China(-5)  04-25|Ferro-silicon 75%min In warehouse Pittsburgh(0.03)  04-25|Iron Ore Fine Australian 62%min CNF China(3)  04-25|Ferro-molybdenum 60%min EXW China(6000)  04-25|Indium Ingot 99.995%min EXW China(60)  04-25|Copper Conc. TC 25%min CIF China(-1)  04-25|Calcium-silicon 30-60 FOB China(40)  04-25|Molybdenum Oxide 57%min In port South Korea(0.5)  04-25
  • Ezhou Hongtai Steel's 750,000tpy capacity replacement plan publicized

    2021-12-01 16:10:24   [Print]
    According to the requirements of guiding opinions and measures issued by the State Council regarding overcapacity and capacity replacement, the capacity replacement plan for the 750,000tpy electric furnace construction project of Ezhou Hongtai Steel Co.Asian Metal CopyrightAccording to the requirements of guiding opinions and measures issued by the State Council regarding overcapacity and capacity replacement, the capacity replacement plan for the 750,000tpy electric furnace construction project of Ezhou Hongtai Steel Co.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright is hereby publicized after the application of the company and the review of the local industry and information technology department.Asian Metal Copyright .Asian Metal Copyright The publicity date is from November 29 to December 24, 2021.
    .Asian Metal Copyright Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.