• Erbium Oxide 99.5%min EXW China(9)  04-29|Copper Conc. TC 25%min CIF China(-1)  04-29|Selenium Powder 99.9%min Delivered India(50)  04-29|Met. Coke A 13%max, S 0.7%max EXW Shanxi(50)  04-29|Arsenic Metal 99.9999%min Delivered China(-7)  04-29|Silicon Metal 98.5%min Delivered US(0.04)  04-29|Ferro-chrome Cr 60%min, C 8%max In warehouse Pittsburg(-0.05)  04-29|Met. Coke A 13%max, S 0.7%max EXW Hebei(50)  04-29|Met. Coke A 13%max, S 0.7%max EXW Shandong(50)  04-29|Zinc Conc. TC 50% CIF China(-1.5)  04-29|Ferro-silicon 75%min In warehouse Pittsburgh(0.03)  04-29|Ferro-chrome Cr 60%min, C 8%max In warehouse Rotterdam(-0.04)  04-29|Ferro-tungsten 75%min In warehouse Rotterdam(1)  04-29|Ferro-tungsten 75%min FOB Russia(1)  04-29
  • Main construction of Huayue ni-co hydrometallurgy project begins in Indonesia

    2020-03-04 16:51:39   [Print]
    On 1 March, China MCC20 Group started to build Huayue nickel and cobalt hydrometallurgy project.

    The project is located in MOROWALI Industrial Park, Sulawesi, Indonesia, with a contract period of 16 months. The project adopts a new production process, which will change the current nickel and cobalt industrial pattern of the world after the completion and operation of the project.

    .Asian Metal Copyright The project is located in MOROWALI Industrial Park, Sulawesi, Indonesia, with a contract period of 16 monthsAsian Metal Copyright
    Cobalt Carbonate 46%min Delivered China
    Unit:RMB/mt
    China cobalt carbonate producers' suspension number statistics by province by month
    Unit: pcs
      Copyright © Asian Metal Ltd All rights reserved.