• Manganese Ore S.A. 36%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 36%min In Tianjin Port(2)  04-26|Manganese Ore S.A. 37%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 37%min In Tianjin Port(2)  04-26|Manganese Ore Brazilian 44%min In Qinzhou Port(2.1)  04-26|Manganese Ore Brazilian 44%min In Tianjin Port(2.1)  04-26|Manganese Ore Gabonese 44%min In Qinzhou Port(1.9)  04-26|Manganese Ore Gabonese 44%min In Tianjin Port(1.9)  04-26|Manganese Ore Australian 45%min In Qinzhou Port(1.8)  04-26|Manganese Ore Australian 45%min In Tianjin Port(1.8)  04-26|Silicon Metal 98.5%min Delivered US(0.04)  04-26|Copper Conc. TC 25%min CIF China(-1)  04-26|Ferro-silicon 75%min In warehouse Pittsburgh(0.03)  04-26|Zinc Conc. TC 50% CIF China(-1.5)  04-26
  • GD Group completes restructuring

    2017-12-29 17:43:08   [Print]
    On the morning of December 28th, Golden Dragon Precise Copper Tube Group Inc.Asian Metal Copyright GD Group's copper tube output in 2017 reaches 500,000t, which is the highest level since establishment.Asian Metal Copyright signed strategic restructuring agreement with the Wanzhou District Government.

    The phase 1 project, covering more than 100 mu and with a total investment of RMB1.38 million, went into production on December 28th and 3 precision copper tube production lines were built.Asian Metal Copyright Besides taxes, GD Group's copper trading project, owing RMB300 million of investment and settled in Wanzhou, will offer over 500 jobs and give impetus to the development of relevant industries.Asian Metal Copyright Their equipment was imported from famous manufactures all over the world, such as Finland, Italy, USA and Japan and the company can own the most advanced cost-rolling copper tube production lines after completion coupled with the patent technology of GD Group.

    The company can own 80,000tpy capacity of copper tube after 3 production lines going into production and will realize sales revenue of RMB3.5 million and annual incoming taxes of RMB54 million.Asian Metal Copyright38 million, went into production on December 28th and 3 precision copper tube production lines were built.Asian Metal Copyright Besides taxes, GD Group's copper trading project, owing RMB300 million of investment and settled in Wanzhou, will offer over 500 jobs and give impetus to the development of relevant industries.

    GD Group's copper tube output in 2017 reaches 500,000t, which is the highest level since establishment.

    Li Changjie revealed on the restructuring conference on December 28th that the company should endeavor to put 3 production lines into production before the end of 2018.

    .Asian Metal Copyright signed strategic restructuring agreement with the Wanzhou District GovernmentAsian Metal Copyright
    Copper Scrap Wire 99%min Delivered China
    Unit:RMB/mt
    China copper concentrate producers' operating rate statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.