• Silico-manganese 65/17 EXW China(300)  04-25|Silico-manganese 60/14 EXW China(200)  04-25|Indium Ingot 99.995%min FOB China(9)  04-25|Molybdenum Conc. 45%min EXW China(100)  04-25|Steel Scrap MMS 4-6mm EXW Guangzhou(80)  04-25|Molybdenum Oxide 50%min EXW China(100)  04-25|Zirconium Sponge Zr+Hf 99.4%min EXW China(-5)  04-25|Ferro-silicon 75%min In warehouse Pittsburgh(0.03)  04-25|Iron Ore Fine Australian 62%min CNF China(3)  04-25|Ferro-molybdenum 60%min EXW China(6000)  04-25|Indium Ingot 99.995%min EXW China(60)  04-25|Copper Conc. TC 25%min CIF China(-1)  04-25|Calcium-silicon 30-60 FOB China(40)  04-25|Molybdenum Oxide 57%min In port South Korea(0.5)  04-25
  • National Energy Administration: China cut 2.4 million KW of backward coal powder capacity in first three quarters

    2017-11-02 16:26:42   [Print]
    The National Energy Administration held a press conference on October 31st to introduce the energy situation and the development of renewable energy in the first three quarters of 2017.Asian Metal Copyright In particular, Beijing, Tianjin, Hebei, Henan and several other provinces or cities had fulfilled the transformation target one or two years ahead of the plan.Asian Metal Copyright During the first three quarters, China had shut down about 2.Asian Metal Copyright In particular, Beijing, Tianjin, Hebei, Henan and several other provinces or cities had fulfilled the transformation target one or two years ahead of the plan.Asian Metal Copyright4 million kilowatts of backward coal power units, and called off or suspended the construction of over 50 million kilowatts of coal power capacity.Asian Metal Copyright .Asian Metal Copyright By the end of September 2017, China had transformed about 580 million kilowatts of coal power capacity to meet the ultra-low emission standard, two years ahead of the schedule to complete the target by 2020; and has transformed 530 million kilowatts of coal power capacity to meet the energy-saving standards, accounting for 85% of the target.Asian Metal CopyrightThe National Energy Administration held a press conference on October 31st to introduce the energy situation and the development of renewable energy in the first three quarters of 2017.Asian Metal Copyright In particular, Beijing, Tianjin, Hebei, Henan and several other provinces or cities had fulfilled the transformation target one or two years ahead of the plan.

    .Asian Metal Copyright In particular, Beijing, Tianjin, Hebei, Henan and several other provinces or cities had fulfilled the transformation target one or two years ahead of the planAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.