• Met. Coke A 13%max, S 0.7%max EXW Shanxiup(50)  07-31|Met. Coke A 13%max, S 0.7%max EXW Hebeiup(50)  07-31|Met. Coke A 13%max, S 0.7%max EXW Shandongup(50)  07-31|Spodumene Li2O 6%min CIF Chinadown(-25)  07-31|Spodumene Li2O 3%min In port Chinadown(-25)  07-31|Lithium Iron Phosphate Li 3.9%min Delivered Chinadown(-1000)  07-31|Lithium Carbonate 99.2%min Delivered Chinadown(-2000)  07-31|Lithium Carbonate 99.5%min Delivered Chinadown(-2000)  07-31|Spodumene Li2O 5%min In port Chinadown(-30)  07-31|Ferro-silicon 70%min EXW Indiaup(2000)  07-31|Chrome Lump S.A. 38%min CIF Chinaup(5)  07-31|Coking Coal A 10%max, S 0.8%max EXW Hebeiup(30)  07-31|Calcium-silicon 30-60 Ex-VAT FOB Chinadown(-30)  07-31|Coking Coal A 10%max, S 0.8%max EXW Henanup(30)  07-31
  • Xinjiang's first storage center for waste recycling and harmless disposal of waste lead-acid battery completed

    2017-06-29 17:30:00   [Print]
    To encourage the establishment of an integrated control principle of recycling mechanism and end treatment of waste lead acid battery, promote the utilization and harmless disposal of waste resources, make good use of recycling and regeneration of waste lead acid battery, improve the environmental quality, and reflect the concept of ecological design, green recycling and recycling of resources, the technicists of environmental monitoring main station of Xinjiang conducted inspections on 6 waste battery storage centers of Urumqi, Khotan, kashi, Korla, Aqsu, and Yining and finished the inspections after almost one month.Asian Metal Copyright .Asian Metal Copyright The total construction area of the 6 centers is 1,500 square meters, and the total volume of waste lead-acid battery is about 7,000t.Asian Metal Copyright After the construction of the project, it can dispose 160,000tpy of waste lead acid battery, produce 100,000tpy of secondary lead, and make 3.Asian Metal Copyright The waste lead-acid batteries stored in Xinjiang will be disposed harmlessly in inland.Asian Metal Copyright The total construction area of the 6 centers is 1,500 square meters, and the total volume of waste lead-acid battery is about 7,000t.Asian Metal Copyright Besides, Xinjiang plans to construct a storage center in Toksun.Asian Metal CopyrightTo encourage the establishment of an integrated control principle of recycling mechanism and end treatment of waste lead acid battery, promote the utilization and harmless disposal of waste resources, make good use of recycling and regeneration of waste lead acid battery, improve the environmental quality, and reflect the concept of ecological design, green recycling and recycling of resources, the technicists of environmental monitoring main station of Xinjiang conducted inspections on 6 waste battery storage centers of Urumqi, Khotan, kashi, Korla, Aqsu, and Yining and finished the inspections after almost one month.Asian Metal Copyright After the construction of the project, it can dispose 160,000tpy of waste lead acid battery, produce 100,000tpy of secondary lead, and make 3.Asian Metal Copyright Due to the lack of publicity, the residents lack awareness of the dangers of the waste lead-acid batteries with weak environmental awareness and are unable to actively participate in the recycling of waste lead-acid batteries.Asian Metal Copyright8 million storage batteries per year.Asian Metal Copyright The waste lead-acid batteries stored in Xinjiang will be disposed harmlessly in inland.Asian Metal Copyright The project will achieve full cycling and "zero" emissions and creat the only waste battery recycling and recycling lead processing base in xinjiang.

    At present, Xinjiang sees about 200,000tpy of waste storage battery and is unable to dispose about 20,000tpy of waste acid harmlessly. Due to the lack of publicity, the residents lack awareness of the dangers of the waste lead-acid batteries with weak environmental awareness and are unable to actively participate in the recycling of waste lead-acid batteries.Asian Metal Copyright After the construction of the project, it can dispose 160,000tpy of waste lead acid battery, produce 100,000tpy of secondary lead, and make 3.Asian Metal Copyright Completion of the project led to the circulation industry, promoted the cyclic utilization and governance of recycling of waste lead acid storage battery, improved residents' awareness of waste lead acid storage battery damage, protected the beautiful environment of Xinjiang.

    .Asian Metal Copyright Due to the lack of publicity, the residents lack awareness of the dangers of the waste lead-acid batteries with weak environmental awareness and are unable to actively participate in the recycling of waste lead-acid batteriesAsian Metal Copyright
    Lead Ingot Secondary 99.994%min EXW China
    Unit:RMB/mt
    Lead Ingot Secondary 99.994%min EXW China RMB/mt
    China secondary lead producers' suspension number statistics by province by month
    Unit: pcs
      Copyright © Asian Metal Ltd All rights reserved.