• Manganese Ore Gabonese 44%min In Tianjin Port(1.5)  04-19|Manganese Ore Gabonese 44%min In Qinzhou Port(1.5)  04-19|Manganese Ore Australian 45%min In Qinzhou Port(1.5)  04-19|Manganese Ore Australian 45%min In Tianjin Port(1.5)  04-19|Manganese Ore Brazilian 44%min In Tianjin Port(1.5)  04-19|Ferro-chrome Cr 60%min, C 0.1%max In warehouse Rotterdam(-0.1)  04-19|Manganese Ore S.A. 36%min In Tianjin Port(1.3)  04-19|Manganese Ore Brazilian 44%min In Qinzhou Port(1.3)  04-19|Manganese Sulfate Mn 32%min EXW China(150)  04-19|Copper Conc. 20%min Delivered China(2150)  04-19|Manganese Ore S.A. 36%min In Qinzhou Port(1)  04-19|Manganese Ore S.A. 37%min In Qinzhou Port(1)  04-19|Manganese Ore S.A. 37%min In Tianjin Port(1)  04-19|Indium Ingot 99.995%min EXW China(60)  04-19
    • Company: 
    • Clarince Construction and Mining Zambia Ltd
    • Contact: 
    • Prince Chileshe
    • Tel: 
    • +260 979976543
    • Fax: 
    • Date :
    • 2012-03-30 22:26:06
    • Buy/Sell:
    • sell
    • Metal :
    • IRON ORE
    • Specification:
    • Fe 64.5 %, rejection below 63.5% AI2O3 1.4 % SiO2 2.08 % TiO2 0.08 %... iron ore: ore
    • Quantity:
    • 10000 mt minimum order
    • Price:
    • negotiable.US $ per MT.
    • Origin:
    • ZAMBIA
    • Packing:
    • as required
    • Loading Port:
    • Dar Es Salaam, Tanzania.
    • Shipment Date:
    • within 5 days
    • Delivery:
    • F.O.B
    • Payment:
    • T/T OR L.C
    • Documents:
    • CONTRACT
    • Inspection:
    • ANALYSIS REPORT
    • Validity:
    • longterm
    • Remark:
    • The current market price of the commodities commercialized by SELLER would be provided in Full Corporate Offer (FCO) addressed to the interested party.
    • Attachment1:
    • Attachment2:
    Send an Inquiry:
      Copyright © Asian Metal Ltd All rights reserved.