• Silico-manganese 65/17 EXW China(300)  04-25|Silico-manganese 60/14 EXW China(200)  04-25|Indium Ingot 99.995%min FOB China(9)  04-25|Molybdenum Conc. 45%min EXW China(100)  04-25|Steel Scrap MMS 4-6mm EXW Guangzhou(80)  04-25|Molybdenum Oxide 50%min EXW China(100)  04-25|Zirconium Sponge Zr+Hf 99.4%min EXW China(-5)  04-25|Ferro-silicon 75%min In warehouse Pittsburgh(0.03)  04-25|Iron Ore Fine Australian 62%min CNF China(3)  04-25|Ferro-molybdenum 60%min EXW China(6000)  04-25|Indium Ingot 99.995%min EXW China(60)  04-25|Copper Conc. TC 25%min CIF China(-1)  04-25|Calcium-silicon 30-60 FOB China(40)  04-25|Molybdenum Oxide 57%min In port South Korea(0.5)  04-25
  • Anfu brings in national level R&D and Production project of Li-ion battery separator

    2017-06-28 17:47:32   [Print]
    Recently, Jiangxi Zhongtai Science & Technology Co.Asian Metal Copyright5 billion in total in the project which is divided into three phases.Asian Metal Copyright, Ltd.Asian Metal Copyright finally settled in Anfu industrial park and owned its workshop, focusing on bringing in new production equipment and building production line now, and expecting to be operational officially in July.Asian Metal Copyright finally settled in Anfu industrial park and owned its workshop, focusing on bringing in new production equipment and building production line now, and expecting to be operational officially in July.

    A major director of the company revealed that the company mainly engages in the R&D, production and sales of high-performance power battery separator, with the power battery separator production taking the leading position around the country as the national level R&D and industrial base. The company jointly builds the united laboratory of Li-ion battery separator and industry-university-research cooperation base with Nanjing University.

    The company covers an area of about 78667㎡ and invests RMB1.5 billion in total in the project which is divided into three phases.Asian Metal Copyright A major director of the company revealed that the company mainly engages in the RD, production and sales of high-performance power battery separator, with the power battery separator production taking the leading position around the country as the national level RD and industrial base.Asian Metal Copyright It expects to recruit 300 stuff in the project with an annual capacity of 50,000㎡ of Li-ion battery separator and see the annual production value of RMB900 million in phase one and phase two, with the revenue of above RMB40 million.

    .Asian Metal Copyright5 billion in total in the project which is divided into three phasesAsian Metal Copyright
    Lithium Hydroxide Monohydrate LiOH 56.5%min Delivered China
    Unit:RMB/mt
    China lithium carbonate 99%min producers' operating rate statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.