• Manganese Ore Gabonese 44%min In Tianjin Port(1.5)  04-19|Manganese Ore Australian 45%min In Qinzhou Port(1.5)  04-19|Manganese Ore Gabonese 44%min In Qinzhou Port(1.5)  04-19|Manganese Ore Brazilian 44%min In Tianjin Port(1.5)  04-19|Manganese Ore Australian 45%min In Tianjin Port(1.5)  04-19|Ferro-chrome Cr 60%min, C 0.1%max In warehouse Rotterdam(-0.1)  04-19|Manganese Ore S.A. 36%min In Tianjin Port(1.3)  04-19|Manganese Ore Brazilian 44%min In Qinzhou Port(1.3)  04-19|Manganese Sulfate Mn 32%min EXW China(150)  04-19|Copper Conc. 20%min Delivered China(2150)  04-19|Manganese Ore S.A. 36%min In Qinzhou Port(1)  04-19|Manganese Ore S.A. 37%min In Qinzhou Port(1)  04-19|Manganese Ore S.A. 37%min In Tianjin Port(1)  04-19|Indium Ingot 99.995%min EXW China(60)  04-19
  • Zhanjiang Steel starts 2100mm hot rolled high strength steel crosscutting line project

    2021-12-16 17:42:55   [Print]
    On December 14, 2021, Zhanbao High-tech held the groundbreaking ceremony for the 2100mm hot rolled high strength steel crosscutting line project.Asian Metal CopyrightOn December 14, 2021, Zhanbao High-tech held the groundbreaking ceremony for the 2100mm hot rolled high strength steel crosscutting line project.Asian Metal Copyright The infrastructure works are scheduled to be completed before the Spring Festival, and the overall project is expected to be completed by the end of June 2022.


    .Asian Metal Copyright Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.