• Manganese Ore Gabonese 44%min In Tianjin Port(1.5)  04-19|Manganese Ore Gabonese 44%min In Qinzhou Port(1.5)  04-19|Manganese Ore Australian 45%min In Qinzhou Port(1.5)  04-19|Manganese Ore Australian 45%min In Tianjin Port(1.5)  04-19|Manganese Ore Brazilian 44%min In Tianjin Port(1.5)  04-19|Ferro-chrome Cr 60%min, C 0.1%max In warehouse Rotterdam(-0.1)  04-19|Manganese Ore S.A. 36%min In Tianjin Port(1.3)  04-19|Manganese Ore Brazilian 44%min In Qinzhou Port(1.3)  04-19|Manganese Sulfate Mn 32%min EXW China(150)  04-19|Copper Conc. 20%min Delivered China(2150)  04-19|Manganese Ore S.A. 36%min In Qinzhou Port(1)  04-19|Manganese Ore S.A. 37%min In Qinzhou Port(1)  04-19|Manganese Ore S.A. 37%min In Tianjin Port(1)  04-19|Indium Ingot 99.995%min EXW China(60)  04-19
  • CNGR to invest RMB10 billion in constructing LFP integration project

    2021-12-10 15:51:06   [Print]
    On December 9, CNGR announced that it plans to invest about RMB10 billion (USD1.Asian Metal Copyright The project will be built via three stages with a construction cycle of 33 months.Asian Metal Copyright57 billion) in constructing a 200,000tpy ferric phosphate and LFP material integration project in Kaiyang county, Guangdong province, and matching production facilities including phosphorite-based phosphoric acid, yellow phosphorus and MAP (monoammonium phosphate), as well as phosphorite mining facilities so as to guarantee the annual 220,000t LFP production.Asian Metal Copyright The project will be built via three stages with a construction cycle of 33 months.Asian Metal Copyright The project will be built via three stages with a construction cycle of 33 months.

    .Asian Metal Copyright The project will be built via three stages with a construction cycle of 33 monthsAsian Metal Copyright
    Lithium Iron Phosphate Li 3.9%min Delivered China
    Unit:RMB/mt
    China lithium hydroxide monohydrate producers; inventory statistics by province by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.