• Silico-manganese 65/17 EXW China(300)  04-25|Silico-manganese 60/14 EXW China(200)  04-25|Indium Ingot 99.995%min FOB China(9)  04-25|Molybdenum Conc. 45%min EXW China(100)  04-25|Steel Scrap MMS 4-6mm EXW Guangzhou(80)  04-25|Molybdenum Oxide 50%min EXW China(100)  04-25|Zirconium Sponge Zr+Hf 99.4%min EXW China(-5)  04-25|Ferro-silicon 75%min In warehouse Pittsburgh(0.03)  04-25|Ferro-molybdenum 60%min EXW China(6000)  04-25|Iron Ore Fine Australian 62%min CNF China(3)  04-25|Indium Ingot 99.995%min EXW China(60)  04-25|Copper Conc. TC 25%min CIF China(-1)  04-25|Calcium-silicon 30-60 FOB China(40)  04-25|Molybdenum Oxide 57%min In port South Korea(0.5)  04-25
  • Liuzhou Steel converter plant's third dust removal renovation project completed

    2021-12-01 17:14:32   [Print]
    On November 30, the completion ceremony of the third dust removal renovation project of Liuzhou Steel converter plant was held.Asian Metal CopyrightOn November 30, the completion ceremony of the third dust removal renovation project of Liuzhou Steel converter plant was held.Asian Metal Copyright This project is an important measure for Liuzhou Steel to promote the implementation of ultra-low emissions in the metallurgical industry, push forward enterprise transformation and upgrade, high-quality development, and help win the battle against the haze day.
    .Asian Metal Copyright Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.