150,000tpy low-consumption prebaked anode project built in Jining
2021-11-22 11:54:23 [Print]
On November 18, "low-consumption prebaked anode project with an annual output of 150,000 tons" was signed in Rencheng District, Jining
. The total investment of the project is 876 million yuan (137 million US dollars) and the planned area is 50 . 4mu . After completion, it can produce 118,800 tons of saturated steam per year, equivalent to nearly 20,000 tons of standard coal, and can reduce the comprehensive energy consumption to less than 2,000 tons of standard coal . Using this product, the carbon dioxide emission per ton of primary aluminum can be reduced by more than 50kg . After the completion of the project, it will become the only low-consumption anode production line in China, with an annual output value of 1 billion yuan (157 million US dollars).