• Met. Coke A 13%max, S 0.7%max EXW Shanxi(50)  04-18|Met. Coke A 13%max, S 0.7%max EXW Hebei(50)  04-18|Met. Coke A 13%max, S 0.7%max EXW Shandong(50)  04-18|Mercury Metal 99.9%min Ex-VAT EXW China(30)  04-18|Coking Coal A 10.5%max, S 0.8%max EXW Shanxi(50)  04-18|Mercury Metal 99.999%min Ex-VAT EXW China(30)  04-18|Iron Ore Fine Australian 62%min CNF China(3)  04-18|Iron Ore Fine Australian 58%min In port China(20)  04-18|Samarium Metal 99.5%min FOB China(-0.3)  04-18|Samarium Metal 99.5%min EXW China(-2)  04-18|Iron Ore Fine Australian 62%min In port China(20)  04-18|Holmium Oxide 99.5%min EXW China(10)  04-18|Ferro-holmium 80% EXW China(10)  04-18|Iron Ore Lump Australian 62%min In port China(20)  04-18
  • Hebei announces work plan for off-peak steel production in heating season in 2021-2022

    2021-11-17 14:43:46   [Print]
    Recently, the Industry and Information Technology of Hebei Province and the Department of Ecology and Environment of Hebei Province jointly issued the notice on the work plan for staggered peak production of iron and steel industry in the heating season of Hebei Province from 2021 to 2022.Asian Metal Copyright The plan requires that from November 15, 2021 to December 31, 2021, the goal of reducing crude steel output in the region shall be ensured.Asian Metal Copyright The plan specifies that iron and steel smelting enterprises (including central enterprises and Tianjin enterprises) in Hebei Province will implement staggered peak production in Shijiazhuang, Tangshan, Handan, Xingtai, Cangzhou, Xinji, Chengde, Zhangjiakou and Qinhuangdao from November 15, 2021 to March 15, 2022.

    The plan requires that from November 15, 2021 to December 31, 2021, the goal of reducing crude steel output in the region shall be ensured. From January 1, 2022 to March 15, 2022, with the goal of reducing the increased emission of air pollutants in the heating season, in principle, the proportion of staggered peak production of iron and steel enterprises in relevant cities shall not be less than 30% of the crude steel output in the same period of the previous year.

    .Asian Metal Copyright The plan specifies that iron and steel smelting enterprises including central enterprises and Tianjin enterprises in Hebei Province will implement staggered peak production in Shijiazhuang, Tangshan, Handan, Xingtai, Cangzhou, Xinji, Chengde, Zhangjiakou and Qinhuangdao from November 15, 2021 to March 15, 2022Asian Metal Copyright
    Ferro-chrome Cr 65%min, C 0.1%max In warehouses Russia
    Unit:RUB/kg
    China low carbon ferrochrome producers' inventory statistics by province by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.