• Tin Conc. Burmese 20%min In warehouse MengA(-7000)  04-24|Tin Conc. Burmese 30%min In warehouse MengA(-7000)  04-24|Molybdenum Conc. 45%min EXW China(100)  04-24|Met. Coke A 13%max, S 0.7%max EXW Shanxi(50)  04-24|Molybdenum Oxide 50%min EXW China(100)  04-24|Cobalt Intermediate 30-40% CIF China(-0.2)  04-24|Erbium Oxide 99.5%min FOB China(1.2)  04-24|Ferro-manganese Mn 65%min, C 7%max EXW China(150)  04-24|Met. Coke A 13%max, S 0.7%max EXW Hebei(50)  04-24|Tin Conc. 60%min Delivered China(-7000)  04-24|Met. Coke A 13%max, S 0.7%max EXW Shandong(50)  04-24|Ferro-silicon 75%min In warehouse Pittsburgh(0.03)  04-24|Ferro-molybdenum 60%min EXW China(6000)  04-24|Erbium Oxide 99.5%min EXW China(8)  04-24
  • Impact Minerals identifies rare earth elements targets at Arkun Ni-Cu-PGM project

    2021-10-28 11:34:03   [Print]
    A number of high priority targets for rare earth elements (REE) and rubidium have been identified in recent soil geochemistry results at Australian Impact Minerals' wholly-owned Arkun nickel-copper and platinum group metal project in the emerging mineral province of southwest Western Australia.

    From the soil results, Impact said it was evident that the central part of the Arkun project area stands out as being strongly anomalous in REE, with six of the targets identified as warranting follow up work.
    .Asian Metal Copyright From the soil results, Impact said it was evident that the central part of the Arkun project area stands out as being strongly anomalous in REE, with six of the targets identified as warranting follow up workAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.