• Cobalt Sulfate 20.5%min Delivered China(-1000)  04-16|Terbium Metal 99.9%min FOB China(30)  04-16|Iron Ore Fine 66%min Ex-VAT EXW Handan(25)  04-16|Terbium Metal 99.9%min EXW China(200)  04-16|Terbium Oxide 99.99%min FOB China(22)  04-16|Iron Ore Fine 65%min EXW Laiwu(25)  04-16|Iron Ore Fine 65%min Ex-VAT EXW Daixian(20)  04-16|Iron Ore Fine 65%min EXW Benxi(20)  04-16|Terbium Oxide 99.99%min EXW China(150)  04-16|Gadolinium Oxide 99.99%min EXW China(5000)  04-16|Ferro-gadolinium Gd 73% EXW China(4000)  04-16|Aluminum Ingot 99.7%min In warehouse Foshan(-480)  04-16|Aluminum Ingot 99.7%min In warehouse Wuxi(-480)  04-16|Copper Conc. TC 25%min CIF China(-1)  04-16
  • JISCO iron-making project capacity replacement capacity program made public

    2021-09-07 14:39:17   [Print]
    Public opinion will be sought on the iron-making capacity replacement program of Jiuquan Iron and Steel (Group) Co.Asian Metal Copyright JISCO metallurgical plant area, Jiayuguan Blast furnace 2,070 Cubic meter 1 176 2022 2024 1.Asian Metal Copyright, Ltd.Asian Metal Copyright25:1 Project closed No.Asian Metal Copyright from September 6 to October 8, 2021 in accordance with relevant guidelines and implementation measures issued by the State Council.

    New project

    Company

    Construction site

    Equipment details

    Construction
    to start in

    Production
    to start in

    Replacement ratio

    Type

    Volume

    Unit

    Quantity

    Capacity to be built (10ktpy)

    JISCO Hongxing Iron and Steel Co., Ltd.

    JISCO metallurgical plant area, Jiayuguan

    Blast furnace

    2,070

    Cubic meter

    1

    176

    2022

    2024

    1.25:1

    Project closed

    No.

    Province (district, city)

    Company

    Equipment details

    Dismantlement
    to begin

    Dismantlement to complete

    Note

    Type

    Volume

    Unit

    Quantity

    Capacity to be shutdown(10ktpy)

    1

    Jiayuguan, Gansu

    JISCO Hongxing Iron and Steel Co., Ltd.

    Blast furnace

    450

    Cubic meter

    4

    220

    Before new project comes on stream

    Before new project comes on stream

    2.2Mtpy capacity completely  transferred for new project

    Total

    /

    /

    /

    /

    /

    /

    220 (iron-making)

    /

    /

    /



    .Asian Metal Copyright, LtdAsian Metal Copyright