• Manganese Ore Gabonese 44%min In Tianjin Port(1.5)  04-19|Manganese Ore Gabonese 44%min In Qinzhou Port(1.5)  04-19|Manganese Ore Australian 45%min In Qinzhou Port(1.5)  04-19|Manganese Ore Australian 45%min In Tianjin Port(1.5)  04-19|Manganese Ore Brazilian 44%min In Tianjin Port(1.5)  04-19|Ferro-chrome Cr 60%min, C 0.1%max In warehouse Rotterdam(-0.1)  04-19|Manganese Ore S.A. 36%min In Tianjin Port(1.3)  04-19|Manganese Ore Brazilian 44%min In Qinzhou Port(1.3)  04-19|Manganese Sulfate Mn 32%min EXW China(150)  04-19|Copper Conc. 20%min Delivered China(2150)  04-19|Manganese Ore S.A. 36%min In Qinzhou Port(1)  04-19|Manganese Ore S.A. 37%min In Qinzhou Port(1)  04-19|Manganese Ore S.A. 37%min In Tianjin Port(1)  04-19|Indium Ingot 99.995%min EXW China(60)  04-19
  • Two stainless steel production lines of Baosteel Desheng New Steel-Making Engineering go into production

    2021-08-26 12:01:12   [Print]
    Following the smooth thermal load test run and production of 1# AOD furnace, the thermal load test run of 2# AOD furnace also succeeded recently, indicating that both of the two stainless steel production lines of Baosteel Desheng New Steel-Making Engineering undertaken by China MCC17 were put into production successfully.Asian Metal CopyrightFollowing the smooth thermal load test run and production of 1# AOD furnace, the thermal load test run of 2# AOD furnace also succeeded recently, indicating that both of the two stainless steel production lines of Baosteel Desheng New Steel-Making Engineering undertaken by China MCC17 were put into production successfully.Asian Metal Copyright Baosteel Desheng New Steel-Making Engineering is divided into two phases in implementation.Asian Metal Copyright Baosteel Desheng New Steel-Making Engineering is divided into two phases in implementation.Asian Metal Copyright The phase one engineering includes one high-quality special steel production line and two 400-serise stainless steel production lines, planning to produce 1.Asian Metal Copyright .Asian Metal Copyright443 million tons of high-quality molten steel and 1.Asian Metal Copyright The phase one engineering includes one high-quality special steel production line and two 400-serise stainless steel production lines, planning to produce 1.Asian Metal Copyright354 million tons of 400-series stainless steel molten steel per year.


    .Asian Metal Copyright443 million tons of high-quality molten steel and 1Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.