• Manganese Ore Gabonese 44%min In Tianjin Port(1.5)  04-19|Manganese Ore Australian 45%min In Qinzhou Port(1.5)  04-19|Manganese Ore Gabonese 44%min In Qinzhou Port(1.5)  04-19|Manganese Ore Brazilian 44%min In Tianjin Port(1.5)  04-19|Manganese Ore Australian 45%min In Tianjin Port(1.5)  04-19|Ferro-chrome Cr 60%min, C 0.1%max In warehouse Rotterdam(-0.1)  04-19|Manganese Ore S.A. 36%min In Tianjin Port(1.3)  04-19|Manganese Ore Brazilian 44%min In Qinzhou Port(1.3)  04-19|Manganese Sulfate Mn 32%min EXW China(150)  04-19|Copper Conc. 20%min Delivered China(2150)  04-19|Manganese Ore S.A. 36%min In Qinzhou Port(1)  04-19|Manganese Ore S.A. 37%min In Qinzhou Port(1)  04-19|Manganese Ore S.A. 37%min In Tianjin Port(1)  04-19|Indium Ingot 99.995%min EXW China(60)  04-19
  • Sinosteel Engineering and Technology's subsidiary signs EPC contract for high-quality special steel project

    2019-12-31 16:35:51   [Print]
    On 29 December, Sinosteel Equipment & Engineering Company, a wholly-owned subsidiary of Sinosteel Engineering and Technology Co.Asian Metal Copyright65 million for the high-quality special steel project with an annual production capacity of 8 million tons.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright, and Guangzhou Jinshenglan Metallurgy Technology Co.Asian Metal Copyright, and Guangzhou Jinshenglan Metallurgy Technology Co.Asian Metal Copyright, Ltd.Asian Metal Copyright, and Guangzhou Jinshenglan Metallurgy Technology Co.Asian Metal Copyright signed an EPC contract with the value of RMB39.Asian Metal Copyright signed an EPC contract with the value of RMB39.Asian Metal Copyright425 million (USD5.Asian Metal CopyrightOn 29 December, Sinosteel Equipment Engineering Company, a wholly-owned subsidiary of Sinosteel Engineering and Technology Co.Asian Metal Copyright65 million) for the high-quality special steel project with an annual production capacity of 8 million tons.Asian Metal Copyright, Ltd.Asian Metal Copyright The former will start the first phase construction 14 months after receiving the advance payment.
    .Asian Metal Copyright The former will start the first phase construction 14 months after receiving the advance paymentAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.