• Tin Conc. Burmese 20%min In warehouse MengA(-7000)  04-24|Tin Conc. Burmese 30%min In warehouse MengA(-7000)  04-24|Molybdenum Conc. 45%min EXW China(100)  04-24|Met. Coke A 13%max, S 0.7%max EXW Shanxi(50)  04-24|Molybdenum Oxide 50%min EXW China(100)  04-24|Erbium Oxide 99.5%min FOB China(1.2)  04-24|Cobalt Intermediate 30-40% CIF China(-0.2)  04-24|Ferro-manganese Mn 65%min, C 7%max EXW China(150)  04-24|Met. Coke A 13%max, S 0.7%max EXW Hebei(50)  04-24|Tin Conc. 60%min Delivered China(-7000)  04-24|Met. Coke A 13%max, S 0.7%max EXW Shandong(50)  04-24|Ferro-silicon 75%min In warehouse Pittsburgh(0.03)  04-24|Ferro-molybdenum 60%min EXW China(6000)  04-24|Erbium Oxide 99.5%min EXW China(8)  04-24
  • 
    
    Business Visits

    Metro Mining visits Asian Metal

    On December 4, Metro Mining visited Asian Metal. Mr. Simon Finnis, CEO of the company and Mr. Norman Ting, General Manager of Asian Market introduced their bauxite project progress in Australia to Mr. Friday Gao, Senior Analyst of Asian Metal. According to Mr. Simon, they plan to start bauxite production next April and aim to produce around 2 million tonnes in 2018. Mr. Gao analyzed the Chinese alumina and bauxite import market.
    Dr. Juerg Wehrli, Technical General Manager of Metro Mining introduced the better way to use Australian monohydrate bauxite for Chinese alumina refineries.
    Metro Mining will attend the 9th World Aluminum Raw Materials Summit held by Asian Metal in Jinan, Shandong on May 17-18, 2018, to promote the bauxite project and make a report on Monohydrate Australian Bauxite & Alumina Production.
    Asian Metal
    From left: Friday Gao, Simon Finnis, Juerg and Norman Ting
     
      Copyright © Asian Metal Ltd All rights reserved.